Projects are the workspace for planned work: scope, tasks, dates, assignments, and progress. Start on My Projects to open work you already have access to, check your role on a project, create a new project, or remove an old project if your access allows it.

Inside a project, the same task plan can be viewed different ways. The grid is best for structured edits. Gantt is best for dates, dependencies, and critical-path review. Calendar is best for date-based planning. The project workspace keeps those views tied to the same task records, so a schedule change in one view can affect what the team sees elsewhere.

Start From My Projects

Open My Projects and scan the project cards. Each card shows the project name and access indicators such as owner or manager. Open a card to work in the project. Delete a project only when you are sure the project is obsolete; the page asks for confirmation because removal is not a casual cleanup action.

If a project is missing, check the active organization first. Project access follows the organization and your project role. Being signed in is not enough if the project belongs to a different workspace.

Use the search control on My Projects to find a project by its displayed name or indexed metadata. Clear the search and check active filters if an expected project is missing.

Create Or Edit A Project

From My Projects, choose the new-project action and complete the Project Creation Wizard. Enter the name, description, start date, and end date; optionally attach up to four source documents; generate and review the plan; then save the project. Supported wizard documents are PDF, Word, Excel, PowerPoint, plain text, and Markdown. The UI does not publish a fixed per-file size limit, so reduce a very large file if the browser upload fails.

To edit an existing project, open it from My Projects, update project details or tasks in the appropriate tab, and choose Save Project. Project-level fields appear above the task workspace; task fields are edited in the grid, Gantt, calendar, or task editor according to the field.

Project Access, Reassignment, And Deletion

A newly created project is not automatically visible to every user. Visibility follows organization access and the project's owners, managers, teams, task assignments, and applicable role rules.

To reassign work, open the project and select the task, then update its assignment or assignee in the task editor or assignment area and save. Confirm dates and hours after reassignment.

Delete is intended for projects that should no longer exist. Confirm the warning only after checking tasks, assignments, uploaded files, and logged time. If Eos blocks deletion because dependent records exist, keep the project and mark it inactive instead; do not remove time history merely to make deletion succeed.

Work In A Project

A project opens with its header, task workspace, and project actions. The main actions are:

  • Save Project after editing project-level information.
  • Add Task when the current view and your access allow task creation.
  • Export when you need a spreadsheet snapshot of the project.
  • View switching for grid, Gantt, calendar, and other planning surfaces.

The grid and Gantt views are tightly connected. In Gantt, drag task bars or handles to adjust dates. Use dependencies and critical path when timing matters. In the grid, keep task fields clean: name, status, priority, stage, dates, hours, assignments, and signoff details.

Keep The Plan Healthy

Project plans become unreliable when task names are vague, owners are missing, or dates drift without explanation. Before sharing a project update, check:

  • Unassigned tasks.
  • Tasks with missing or stale dates.
  • Blocked or waiting work.
  • Milestones that need client signoff.
  • WBS order before indenting or outdenting tasks.
  • Whether recent edits were saved before export.

Some hierarchy actions depend on the current sort. If indentation is unavailable, sort by WBS Code ascending and try again.

Troubleshooting

If Add Task is hidden, you may be in a view or role where task creation is not available.

If a project opens but data looks incomplete, refresh the page and confirm the correct organization is active.

If a Gantt change does not look right, reload the project content and check dependencies before making more date changes.

If export output looks stale, save the project and run the export again.