Skip to content

Tasks

Tasks are the working records inside a project. A good task names the outcome, has a clear owner, carries realistic timing, and shows the current state of the work. Tasks feed project views, reports, assignments, and follow-up conversations, so small task edits can have wider planning effects.

Create Or Edit A Task

Open a project and choose Add Task, or open an existing task from the project grid, Gantt, or calendar. The task editor stores the fields that matter for planning:

  • Task name.
  • Task stage and status.
  • Assigned hours and priority.
  • Start and end dates.
  • Description and deliverables.
  • Assigned users.
  • Client signoff details for milestone work.

Save before closing the editor. If validation stops the save, fix the highlighted task field and try again.

Assign Work

The assigned-users section links the task to people who are responsible for the work. Assignment rows can be saved or deleted from the editor when your access allows it. Keep assignments current; project staffing, reporting, and handoff conversations depend on them.

For milestone tasks, signoff fields can track whether client approval is needed, who should sign off, due dates, completion dates, and any blocking reason.

Update Dates And Structure

Task dates show up across grid, Gantt, and calendar views. In Gantt, date changes can be made visually. In the grid, use structured fields for more direct editing.

WBS hierarchy is used for parent and child task structure. Sort by WBS Code before indenting or outdenting. Some parent dates may roll up from child tasks, so check the surrounding tasks after structural edits.

Daily Task Hygiene

Before a project review, look for:

  • Tasks without owners.
  • Tasks without dates.
  • Blocked work without a blocking reason.
  • Milestones waiting on signoff.
  • High-priority tasks with no current status.
  • Tasks whose deliverables no longer match the project plan.

Clear task data makes the project views useful. Messy task data makes every downstream report harder to trust.

Troubleshooting

If an assignment delete is blocked, your access or the assignment state may not allow deletion.

If task stage options are missing, metadata may still be loading. Reopen the task after the project finishes loading.

If indent or outdent is disabled, sort by WBS Code ascending first.

If a task save fails, keep the editor open, review the error text, and correct the invalid field.

Projects, Approvals, Reports, Meetings.